Isolated power solutions in compliance with CSA Z32 requirements

The CSA Z32 standard and the Canadian Electric Code requires isolated power systems in areas where receptacles are subject to standing fluid or drenching of the work area that cannot tolerate tripping by actuation of a ground fault circuit interrupter. The NFPA 99 standard requires isolated power systems in all areas deemed "wet procedure" locations in healthcare facilities. Isolated power systems offer an invaluable advantage - early detection of ground-faults allows for critical systems to remain online in a single fault condition. Bender isolated power panels provide isolated power to electrical systems in operating rooms and other critical care areas. Utilizing the latest in technology, Bender equipment ensures that electrical ground-faults are detected and located fast and automatically, in compliance with the latest standards and code requirements.

Downloads:

Isolated Power Planning Guide
Isolated Power Systems Services
EDS Fault Location System